Configure date fields - Brainware for Transcripts - 24.1 - 24.1 - Ready - Brainware - external - Brainware/Brainware-for-Transcripts/24.1/Brainware-for-Transcripts-User-Guide/Configure-Brainware-for-Transcripts/Field-configuration/About-configuring-field-types/Configure-date-fields - 2024-10-28

Brainware for Transcripts User Guide

Platform
Brainware
Product
Brainware for Transcripts
Release
24.1
License

To configure date fields, complete the following steps in SCM.

  1. On the Configure Project page, in the Project list, select the BFT project to be used.
  2. Navigate to Settings > Profile Settings > Field Settings.
  3. In the FutureDays column, enter a numerical value that indicates the number of days in the future from the present date that an extracted date is considered valid. If future dates are not permitted, then this is set to 0 (zero).
  4. In the NoDaysInPast column, enter a numerical value that indicates the number of days in the past from the present date that an extracted date is considered valid. If future dates are not permitted, then this is set to 0 (zero).
  5. To force an extracted date to stop in Dynamic Verifier if the displayed date is not in the current month, set the DateOnlyInCurrentMonth column to True.
  6. 5. To have the date in the Dynamic Verifier displayed as MM/DD/YYYY, in the VerifierOutputFormat column, enter MMDDYYYY, or to display the date as DD/MM/YYYY, enter DDMMYYYY.
    The date output format settings are set for each profile ID, so a different configuration is permitted for each client.
  7. Save the changes.