To update the configuration of a single task:
-
In the left pane, on the Automations tab, select
Tasks.
The Tasks pane is displayed.
-
Click
next to the task whose configuration you want to update and then click View Task.
The Task details pane is displayed. -
Click the Details tab.
The Task options pane is displayed.
-
Click Update Options.
The Update Task Options dialog box is displayed.
-
On the Service level tab:
- In the Expected runtime field, enter the expected execution time for the task, for example 30m or 1h 15m.
-
In the Maximum runtime field, enter the maximum
execution time for the task.
Note: Hyland RPA Conductor terminates the task when the maximum runtime has expired, so set this value carefully.
-
In the Maximum pending time field, enter the
maximum time a task may remain in status Pending
until the first run.
Note: This setting is used for reporting purposes only.
-
On the Options tab:
- Select the Protocol type from the drop-down list.
-
From the Upload execution log drop-down list,
select in which cases you want the system to upload a log after task
execution.
Note: We recommend selecting Failed or stopped.
- Optional. To prevent a screenshot from being uploaded when a task fails, for example if the screenshot might contain sensitive data, clear Upload screenshot on failure.
- Optional. To hide the bot command line during unattended task execution, clear Show bot command line.
- Click Update Task Options.