The Analysis Server transitions charts through the Analysis and Coding processes and burns deficiencies.
- When going live, ensure the Analysis Server is up and running. Otherwise, there could be a large backlog of charts to process, which could negatively affect system and database performance.
- Configure the Analysis Server, Closure Server, and (if applicable) Polling Service to run together on the same process.
- Ensure the Windows user account running the Analysis Server has Modify permissions to the OnBase disk groups.
- If Workflow system tasks are configured for medical records, ensure the Analysis Server has a connection to the OnBase Application Server.
- Ensure the Analysis Server and OnBase Application Server are set to use the same time zone. Otherwise, burned signatures may display inconsistent time zones in their timestamps.