Running Multiple Scheduled Processes - Document Transfer - Foundation 24.1 - Foundation 24.1 - Ready - OnBase - Premier - external - Standard - Premier - Standard - OnBase/Document-Transfer/Foundation-24.1/Document-Transfer/Scheduling/Configuring-Using-the-Scheduler/Running-Multiple-Scheduled-Processes - 2025-04-01 - If multiple jobs are configured, they can be performed sequentially in one OnBase Client session on the same workstation.

Document Transfer

Platform
OnBase
Product
Document Transfer
Release
Foundation 24.1
License
Premier
Standard

If multiple jobs are configured, they can be performed sequentially in one OnBase Client session on the same workstation.

Tip:

Attempting to run more than one process job or format at once in the same session will result in a dramatic drop in all processing speeds. It is recommended to run a single automated process at a time.

Multiple sessions of the OnBase Client can be run simultaneously on one workstation to process these jobs; however, to operate with multiple sessions, it is necessary that each DIP process configured points to its own disk group (thus each DIP process uses a different disk group). These sessions will coordinate processing tasks to ensure that each job is processed and that a job is not processed more than once.

To process jobs in parallel on multiple sessions of the OnBase Client, each session must be OnBase version 9.0 or later. If any one of the sessions is running an earlier version of OnBase, then none of the other sessions will perform any processing while it is processing.