Once a scheduled process has been created, it can be modified as needed.
To modify an existing scheduled process:
-
Open the Schedule Management window in one of the following ways:
-
Right-click in the Document Maintenance window and select Schedule Purge.
-
From the OnBase Client, click Processing | Scheduler | Schedule Management.
Note:Users without the Utilities product right will not be able to view document purge scheduled processes from the Schedule Management window.
-
-
Select the process to be modified from the Scheduled Items box.
Tip:
If you accessed the Schedule Management window from the Document Maintenance window, a new scheduled process was automatically created. If you have no plans to create a new scheduled process, it should be removed.
-
Modify the settings on the Schedule Configuration and Purge Options tabs as needed.
For more information on the options on these tabs, see Schedule Configuration and Schedule Configuration.
- Once you have finished modifying the scheduled process, click Apply.