Viewing Task Details - Unity Scheduler - Foundation 24.1 - Foundation 24.1 - Ready - OnBase - Premier - external - Standard - Essential - Premier - Standard - Essential

Unity Scheduler

Platform
OnBase
Product
Unity Scheduler
Release
Foundation 24.1
License
Premier
Standard
Essential

When the Tasks view is displayed in the View pane, the Details pane is displayed below the list.

When a task is selected, the Details pane displays tabs, which provide general information on the task, information on the schedules the task is using, and execution history for the task. Depending on the task type, other tabs may be available as well.

The General tab includes the name and description of the task.

The Schedule tab includes a list of the schedules assigned to the task. Information on these schedules includes the:

  • Schedule names

  • Current status of the schedule (also reflected in the icon)

  • Date and time the schedule last started

  • Date and time the schedule last ended

  • Date and time the schedule should run next

  • Type of schedule configured

  • Summary of the configured schedule

The History tab is displayed when the task type is able to process items. It includes a list that details each time the task was executed. Information on each execution includes the:

  • Name of the installed scheduler service that ran the task

  • Name of the workstation on which the service is located

  • Data source affected by the task

  • Name of the schedule that ran the task

  • Date and time the task started

  • Date and time the task ended

  • Number of items processed

Other tabs display information about the specific task type configuration. Some tasks do not include these tabs, as some tasks do not require extra configuration.