The DIP process would be run and the verification reports checked to ensure that the documents have been properly processed into OnBase. All of the documents are held in the wait queue until the administrator triggers the reporting process. If the processing fails after 300 documents are processed and there are still 200 waiting, OnBase can simply be re-triggered and the rest of the documents will be posted to the other databases.